These issues concern a section of the Lower Oder River which is approximately 110 km long, as well as the Lake DÄ…bie. They are jointly addressed by the two neighbouring countries. The key objective of the modernisation is to improve the conditions for navigation on the whole border section of the Oder River. It is supposed to ensure minimum depths of about 1.8 m at minimum firm flows in the Oder River, equal to 228 m3·s-1 on the section from the outlet of the Warta River to Widuchowa and 151 m3·s-1 from the outlet of the Lusatian Neisse River to the outlet of the Warta River. Another important objective is to improve the efficiency of ice-breaking operations and thus mitigate the risks caused by ice jamming. The channel of the Oder River was regulated in early 19th century with the use of a system of spurs located on both river banks. The regulation structures did not ensure the expected channel stability and navigable depths. In 1924–1941 corrections were made to the river regulation system with the use of spurs for the socalled low water level, however the efforts have never been completed. The crowns, heads and main bodies of the ...