In the paper the results of carried out technical state and safety opinion of hydro- engineering structure “Bobrowice I” on the Bóbr river were presented. The attention have been paid on the structure exploitation conditions and capacity ability of the weir and the bottom outlet. Problem of sedimentation of the upper reservoir was considered. It was suggested that not every the safety limit is the technical state of the main structure such as weir or the dam. Sometimes its limit are determining by quite different conditions such as lack of possibilities to open the bottom outlet or carrying out reconditioning works on the structure. The influence of such situation on the safety of structure and potential treatment on the ground lying below, was underlined. ...
In the paper a procedure of parking out a water balance within a waste disposal site other than hazardous (municipal) is presented. An attention is paid to problem of supply of waste disposal site with waters from precipitation and resulting problem of moisture exchange within waste disposal site. It is emphasized a necessity of including in water balance a certain amount of water arising during decomposition processes of deposited wastes, moreover of water separation on pure and polluted one. Attention is paid also to changes in water balance, proceeding as disposal site is filled with wastes. It is related to moisture sorption ability of waste deposit, from which results a certain water capacity of waste mass dependent on share of organic matter in wastes and their size reduction and density, which will determined the leachate infiltration rate into base of waste disposal site. In recapitulation a significance and a complexity of water balancing problem, within a waste disposal site other than hazardous is emphasized, resulting from occurring decomposition and exchanging processes within deposited wastes and also from progressive filling up process of disposal site, thereby condensation of created lump. ...
In the paper a proposal of water damming use in 10+100 km of the Biała Lądecka river course is presented. Considering a compelling requirement that till 2015 in UE member's country 15 % of total energy should come from renewable sources, the real example of one of accessible sources is shown - water power engineering, hence every available damming up should improve to a certain degree an existing in Poland unfavourable share of renewable sources in balance of produced electric energy. For water damming in km 10 + 100 it was indicated a possibility to obtain a 100 kW of installed power and also a possibility of water damming rise of about 0,50 m with increasing installed power to 125 kW. Water intake and water supply to hydro-electric power station using short approach flume is described. The attention is paid to an influence of existing damming up on important in Kotlina Kłodzka aspects of flood protection, need of requirements fulfilment of environmental protection are emphasized, in this an assurance of fishes free migration through fall-stage.
...
In the paper a problem of realization of environmental impact assessment of reclamation that consist in removal of wet disposal site of thermoelectric power station Czechnica in Siechnice, is undertaken. An attention is paid on the aim of disposal site removal, which is located in the vicinity of Wrocław water-bearing grounds and also in the vicinity of Nature 2000 area. On the basis of worked out in 2009 in the Institute of Geotechnics and Hydrotechnics of Wrocław University of Technology a conception of removal of this object, the constructional solutions and disposal site exploitation principles, conditioning a maintenance the continuity of electric and heat energy production are described. Natural environment state and possible threats during realization of this project are given. Requirement of individual treatment of this type of constructional object is emphasized, considering that during removal there are possibilities of different influence on surroundings in which object has been earlier operated.
...
In the paper the results of investigations and measurements are presented, carried out for the aim of technical state assessment and safety of fall stage Krępa on the Odra river. Range and methodology of works for fall stages of low head as-sessment are described, elaborated in the Institute of Geotechnics and Hydrotech-nics of Wrocław University of Technology. Problems analyzed during measure-ments and investigations carried out on the studied barrage are discussed. The final conclusion concerns the safety state assessment of investigated object. In the recapitulation a necessity of research for technical state assessment of hydro-engineering structures is emphasized, being of great importance not only for the safety of investigated object but also for areas situated downstream.
...