Mgr inż. Mateusz Gawron

Mgr inż. Maria Łukasiewicz

Dr inż. Mateusz Malinowski

Dr hab. inż. Jacek Salamon

EVALUATION OF WASTEWATER TREATMENT EFFICIENCY IN WOLBROM

The study was conducted to assess the effectiveness of wastewater treatment at the municipal wastewater treatment plant in Wolbrom, to which predominantly domestic wastewater and industrial sewage flow. The assessment was made based on the analysis of the physical and chemical research results of raw and treated wastewater. The research was carried out in the period from January 2014 to December 2014. To perform the analysis of the treatment plant efficiency, four indicators of wastewater pollutants such as BOD5, COD, total nitrogen and total phosphorus were selected for further investigation. For each of the indicators degrees of reduction and coefficients of treatment plant operational reliability were calculated. The calculated degrees of reduction for each of the indicators were high and amounted to 99.0% for BOD5, 95.2% for COD, 91.0% for total nitrogen and 91.6%. for total phosphorus. These results prove the effective reduction in the amount of pollutants. The determined coefficients of treatment plant operational reliability were at a low level: BOD5 - 0.27, COD - 0.44, total nitrogen - 0.33 and total phosphorus - 0.53. The conducted analyses prove the effective operation of the treatment plant, which was confirmed by high efficiency of pollutants removal. ...